Difference between revisions of "Bioretention: Life Cycle Costs"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
Line 1: Line 1:
[[File:IMG 2457 750X500.jpg|thumb|Parking lot bioretention with surface ponding [[well]] in foreground, Kortright Centre, Vaughan, ON. Read about the performance of this practice in the [https://sustainabletechnologies.ca/app/uploads/2016/08/BioVSTrench_TechBrief__July2015.pdf technical brief] (Source: STEP, 2016)<ref>Performance Comparison of Surface and Underground Stormwater Infiltration Practices TECHNICAL BRIEF. Accessed Dec 12 2022. https://sustainabletechnologies.ca/app/uploads/2016/08/BioVSTrench_TechBrief__July2015.pdf</ref>.]]
[[File:IMG 2457 750X500.jpg|thumb|500px|Parking lot bioretention with surface ponding [[well]] in foreground, Kortright Centre, Vaughan, ON. Read about the performance of this practice in the [https://sustainabletechnologies.ca/app/uploads/2016/08/BioVSTrench_TechBrief__July2015.pdf technical brief] (Source: STEP, 2016)<ref>Performance Comparison of Surface and Underground Stormwater Infiltration Practices TECHNICAL BRIEF. Accessed Dec 12 2022. https://sustainabletechnologies.ca/app/uploads/2016/08/BioVSTrench_TechBrief__July2015.pdf</ref>.]]
 


{{TOClimit|2}}
{{TOClimit|2}}

Revision as of 21:16, 12 December 2022

Parking lot bioretention with surface ponding well in foreground, Kortright Centre, Vaughan, ON. Read about the performance of this practice in the technical brief (Source: STEP, 2016)[1].


Overview[edit]

Given that Bioretention is a widely used name and a general "catch-all" term for most vegetated LID practices that temporarily store stormwater runoff in depressed planting beds there are a number of configurations of the feature that can be used in various contexts and environments. Depending on native soil infiltration rate and physical constraints, the facility may be designed without an underdrain for full infiltration, with an underdrain for partial infiltration, or with an impermeable liner and underdrain for no infiltration/filtration only (i.e., a stormwater planters or biofilter) design. STEP conducted life cycle costs estimates for each of bioretention's 3 design configurations which can be viewed below. To design your own life cycle cost estimates that can be adapted to fit your project budget and unique development needs access the updated LCCT Tool here.




Bioretention (all 3 design scenarios): Includes pretreatment sump at inlet and assumes that rehabilitation of filter media bed is performed at 25 years.

  1. Performance Comparison of Surface and Underground Stormwater Infiltration Practices TECHNICAL BRIEF. Accessed Dec 12 2022. https://sustainabletechnologies.ca/app/uploads/2016/08/BioVSTrench_TechBrief__July2015.pdf