*''S<sub>0</sub>'' is the longitudinal slope ratio | *''S<sub>0</sub>'' is the longitudinal slope ratio | ||
*''n'' is Manning's 'n' (between 0.012 and 0.016 for concrete, depending on surface treatment), and | *''n'' is Manning's 'n' (between 0.012 and 0.016 for concrete, depending on surface treatment), and | ||
*''S<sub>x</sub>'' is the cross slope ratio}} | *''S<sub>x</sub>'' is the cross slope ratio (typically between 0.015 and 0.04)}} | ||
Where | Where the intention is to capture only a proportion of the flow, the ratio of flow entering the curb inlet may be calculated:: | ||
<math>R_c=1-\left ( 1-\frac{W}{W_T} \right )^{1.8}</math> | <math>R_c=1-\left ( 1-\frac{W}{W_T} \right )^{1.8}</math> | ||
Line 19: | Line 19: | ||
*''R<sub>c</sub>'' is the proportion of flow entering the curb cut, and | *''R<sub>c</sub>'' is the proportion of flow entering the curb cut, and | ||
*''W'' is the available curb cut width (m)}} | *''W'' is the available curb cut width (m)}} | ||
Where the curb cut width is constrained and a greater flow into the BMP is desired, the effective cross slope may be increased by adding a small depressed section. | |||
<math> | |||
==Example== | ==Example== |
Revision as of 18:18, 31 October 2017
Sizing[edit]
To completely capture linear flow travelling along a gutter perpendicular to a curb inlet, the inlet must be of width::
Where:
- WT is the width of the inlet for complete capture (m),
- Q is the design flow perpendicular to the inlet (m3/s)
- S0 is the longitudinal slope ratio
- n is Manning's 'n' (between 0.012 and 0.016 for concrete, depending on surface treatment), and
- Sx is the cross slope ratio (typically between 0.015 and 0.04)
Where the intention is to capture only a proportion of the flow, the ratio of flow entering the curb inlet may be calculated::
Where:
- Rc is the proportion of flow entering the curb cut, and
- W is the available curb cut width (m)
Where the curb cut width is constrained and a greater flow into the BMP is desired, the effective cross slope may be increased by adding a small depressed section.
The proportion of water entering the bioretention cell under these flow conditions would be::
48% of the 0.08 m3/s (i.e. 0.038 m3/s) would enter the bioretenteion cell through the inlet as designed.
Curb cuts gallery[edit]
This curb cut has been sawn into existing concrete as part of a retrofit. Note the temporary (erosion log) and permanent stone erosion control measures in place. Mississauga Road, ON.
Curb cut used as a controlled overflow route from permeable pavements to a bioretention facility with monitoring well, Lake Simcoe Region Conservation Authority, Newmarket, ON.
Curb cut into a bioretention facility in Brown Deer, WI. Stone is used to reduce erosion around the inlet area. Photo credit: Aaron Volkening
Stone lined inlet at IMAX site in Mississauga
The grading around this inlet prevents flow in the correct direction. i.e. from the pavement onto the grass. Not too critical in this example, as the surface is permeable pavements.
Curb cut into a rain garden on a green street in Newmarket, ON.