==Design checklist==
==Design checklist==
#Verify the drainage area directed to any proposed porous pavement.  If DCIA runoff from other areas on-site, in addition to the direct (1:1) rainfall onto the porous pavement, is directed onto porous pavement, the porous pavement cannot be considered disconnected.  It must instead be considered, and modeled as, a porous pavement structural SMP. The porous surface must be considered, and modeled as, DCIA. Porous pavement structural SMPs require infiltration testing. [Section 4.2.1]
#Verify the drainage area directed to any proposed porous pavement.  If DCIA runoff from other areas on-site, in addition to the direct (1:1) rainfall onto the porous pavement, is directed onto porous pavement, the porous pavement cannot be considered disconnected.  It must instead be considered, and modeled as, a porous pavement structural SMP. The porous surface must be considered, and modeled as, DCIA. Porous pavement structural SMPs require infiltration testing.
#For porous pavement structural SMPs, if infiltration is feasible, verify that the porous pavement design meets all Design Guidance Checklist design standards noted in Appendix F.10, Subsurface Infiltration. [Section 4.2.3, 2]
#For porous pavement structural SMPs, if infiltration is feasible, verify that the porous pavement design meets all Design Guidance Checklist design standards noted in Appendix F.10, Subsurface Infiltration.
#For porous pavement structural SMPs, if infiltration is infeasible, verify that the porous pavement design meets all Design Guidance Checklist design standards noted in Appendix F.14, Subsurface Detention. [Section 4.2.3, 3]
#For porous pavement structural SMPs, if infiltration is infeasible, verify that the porous pavement design meets all Design Guidance Checklist design standards noted in Appendix F.14, Subsurface Detention.


For porous pavement DIC systems:
==For porous pavement DIC systems:==
#Verify that the porous pavement DIC is installed on-site such that it does not create any areas of concentrated infiltration or discharge.
#Verify that the porous pavement DIC is installed on-site such that it does not create any areas of concentrated infiltration or discharge.
#Verify that the surface slope in any direction across porous pavement does not exceed 5%.  
#Verify that the surface slope in any direction across porous pavement does not exceed 5%.  