#For porous pavement structural SMPs, if infiltration is infeasible, verify that the porous pavement design meets all Design Guidance Checklist design standards noted in Appendix F.14, Subsurface Detention.
#For porous pavement structural SMPs, if infiltration is infeasible, verify that the porous pavement design meets all Design Guidance Checklist design standards noted in Appendix F.14, Subsurface Detention.


==For porous pavement DIC systems:==
===For porous pavement DIC systems:===
#Verify that the porous pavement DIC is installed on-site such that it does not create any areas of concentrated infiltration or discharge.
#Verify that the porous pavement DIC is installed on-site such that it does not create any areas of concentrated infiltration or discharge.
#Verify that the surface slope in any direction across porous pavement does not exceed 5%.  
#Verify that the surface slope in any direction across porous pavement does not exceed 5%.  