Changes

Jump to navigation Jump to search
Line 40: Line 40:

'''Construction steps:'''
'''Construction steps:'''
*Soil Media:
*[[Soil media|Soil Media]]:
#Backfill or sling material from outside of the LID facility at the lowest possible speed to avoid loss of component material.
#Backfill or sling material from outside of the LID facility at the lowest possible speed to avoid loss of component material.
#Apply material in 150-300 mm lifts until the desired elevation and thickness, allowing for positive flow.
#Apply material in 150-300 mm lifts until the desired elevation and thickness, allowing for positive flow.

Navigation menu