Changes
Jump to navigation
Jump to search
← Older edit
Newer edit →
Finishing grades and surface layer installation: vegetated LIDs
(view source)
Revision as of 22:21, 22 September 2022
17 bytes added
,
2 years ago
→Finish grading
Line 40:
Line 40:
'''Construction steps:'''
'''Construction steps:'''
*[[
Soil
media|Soil Media]]
:
*[[
Bioretention: Filter
media|Soil Media
:
]]
#Backfill or sling material from outside of the LID facility at the lowest possible speed to avoid loss of component material.
#Backfill or sling material from outside of the LID facility at the lowest possible speed to avoid loss of component material.
#Apply material in 150-300 mm lifts until the desired elevation and thickness, allowing for positive flow.
#Apply material in 150-300 mm lifts until the desired elevation and thickness, allowing for positive flow.
SamanthaPelayo
502
edits
Navigation menu
Personal tools
English
Log in
Namespaces
Page
Discussion
Variants
expanded
collapsed
Views
Read
View source
View history
More
expanded
collapsed
Search
Navigation
Home
Table of contents
All pages
Recent changes
Responses to comments
Tools
Special pages
Printable version