Difference between revisions of "Permeable pavements: Gallery"
Jump to navigation
Jump to search
Line 14: | Line 14: | ||
IMAX water quality sampling (2).JPG|Water quality sampling in permeable pavement study, Mississauga ON | IMAX water quality sampling (2).JPG|Water quality sampling in permeable pavement study, Mississauga ON | ||
Porousasphalt.png|Porous asphalt parking lot (Source: Villanova Urban Stormwater Partnership) | Porousasphalt.png|Porous asphalt parking lot (Source: Villanova Urban Stormwater Partnership) | ||
PermeablePavementConstruction.jpg|Placement of permeable pavers during construction. | |||
PerviousConcreteConstruction.jpg|Crews pour pervious concrete into a parking lot (Source: Washington State Dept of Transportation on Flickr) | PerviousConcreteConstruction.jpg|Crews pour pervious concrete into a parking lot (Source: Washington State Dept of Transportation on Flickr) | ||
</gallery> | </gallery> | ||
[[Category:Gallery]] | [[Category:Gallery]] |
Revision as of 16:48, 19 August 2020
Permeable pavers in parking bays, Mississauga ON (note inspection of bioretention occurring in the background)
Inspection wells should be located at the edges or even off the side of permeable pavement areas