Difference between revisions of "Permeable pavements: Construction"
Jump to navigation
Jump to search
Line 28: | Line 28: | ||
| rowspan="9" style="text-align: center;"| Backfill Granular, <br> Utilities and Pipes ||Geotextile (if applicable) || style="text-align: center;" | x || style="text-align: center;" | x || style="text-align: center;" | x | | rowspan="9" style="text-align: center;"| Backfill Granular, <br> Utilities and Pipes ||Geotextile (if applicable) || style="text-align: center;" | x || style="text-align: center;" | x || style="text-align: center;" | x | ||
|- | |- | ||
| Impermeable Liner (if applicable) || style="text-align: center;" | x || style="text-align: center;" | x || style="text-align: center;"| x | | Impermeable Liner (if applicable) || style="text-align: center;" | x || style="text-align: center;" | x || style="text-align: center;"| x | ||
|- | |- | ||
| Underdrain (if applicable) || style="text-align: center;" | x || style="text-align: center;" | x || style="text-align: center;" | x | | Underdrain (if applicable) || style="text-align: center;" | x || style="text-align: center;" | x || style="text-align: center;" | x |
Revision as of 20:01, 21 July 2022
Add here your content!!
Construction Tasks Table[edit]
Construction Stage | Construction Task | Permeable Interlocking Concrete Pavers |
Porous Asphalt |
Porous Concrete |
---|---|---|---|---|
Pre-Construction | Verification of Siting and LID Design | x | x | x |
Communication and Utilities Coordination | x | x | x | |
Installation of ESC and Construction Fencing | x | x | x | |
ESC Inspection and Maintenance (ongoing) | x | x | x | |
Excavation and Mass Grading |
Clearing and Grubbing | x | x | x |
Excavation | x | x | x | |
Subgrade | x | x | x | |
Verification of Grading/Survey* | x | x | x | |
Backfill Granular, Utilities and Pipes |
Geotextile (if applicable) | x | x | x |
Impermeable Liner (if applicable) | x | x | x | |
Underdrain (if applicable) | x | x | x | |
Overflow or Overflow Drain (if applicable) | x | x | x | |
Monitoring Well (if applicable) | x | x | x | |
Sub-base Reservoir (if applicable) | x | x | x | |
Base Course | x | x | x | |
Filter Layer (if applicable) | x | x | x | |
Bedding layer | x | |||
Finishing Grades | Placement and Finishing | x | x | |
Paver Installation | x | |||
Tamping | x | x | x | |
Joint Cutting | x | |||
Joint Aggregate | x | |||
Curbing (if applicable) | x | x | x | |
Stabilizing Contributing Drainage Area | x | x | ||
As-built Survey | x | x | ||
Post-Construction | Identify and Address Deficiencies | x | x | x |
Assumption/Certification Protocols | x | x | x |