Difference between revisions of "Construction: erosion and sediment control measures"
Kyle menken (talk | contribs) |
Kyle menken (talk | contribs) |
||
Line 38: | Line 38: | ||
*Leave inlets to the stormwater management system unprotected or unsupported | *Leave inlets to the stormwater management system unprotected or unsupported | ||
| | | | ||
[[File:ESC inlet supported.png|300px|thumb|center|This filter stock has been staked in and supported.]] | [[File:ESC inlet supported.png|300px|thumb|center|This filter stock has been staked in and supported. (Source: CVC)]] | ||
| | | | ||
[[File:ESC curb inlet (sediment has entered).jpg|300px|thumb|center|This catch basin was left unprotected, resulting in the release of sediment into the stormwater management system. (Photo source: CISEC)]] | [[File:ESC curb inlet (sediment has entered).jpg|300px|thumb|center|This catch basin was left unprotected, resulting in the release of sediment into the stormwater management system. (Photo source: CISEC)]] |
Revision as of 19:40, 28 July 2022
Pre-construction: erosion and sediment control measures[edit]
Establish required perimeter controls, including erosion and sediment control (ESC) measures, prior to construction and adjust accordingly during construction. ESC measures come in two basic types: structural ESC, which slows and holds runoff from the disturbed area, dissipating erosive forces, promoting ponding, and allowing suspended particles to settle out; and non-structural ESC, which primarily minimizes the exposure time of stripped soils. STEP’s Erosion and Sediment Control Guide contains detailed guidance on the design, installation, inspection, maintenance, and decommissioning of ESC measures. This section gives simple, practical advice on structural and non-structural ESC for contractors, inspectors, and those who are new to construction and ESC practices.
For non-structural ESC measures, be sure to:
- Stage clearing and grubbing to minimize exposure of stripped soils.
- Watch the weather and adjust plans accordingly.
- Manage and demarcate heavy equipment routes away from LID practices.
- Use simple, common-sense methods, such as scarifying exposed soils perpendicular to the grade to prevent the development of rills.
- Create and use a pollution prevention plan for any fuels or solvents.
Generally, all exposed soils that are not being actively worked on must have temporary erosion protection or permanent cover within 7 days for slopes 3:1 or greater and 14 days for slopes 3:1 or lesser and 14 days for slopes 3:1 or flatter. This should apply to all exposed soil areas year-round and until the site is stabilized.
The table below gives guidance on common mistakes made when installing structural ESC measures.
Structural ESC measure | Do | Don't | (Pass) Photo Example | (Fail) Photo Example |
---|---|---|---|---|
Sediment fencing |
|
|
||
Inlet controls |
|
|
||
Stockpiles |
|
|
||
Protecting features during construction, including using sacrificial filter fabric |
|
|
|