Difference between revisions of "Screening LID options"
Line 57: | Line 57: | ||
=== Select LIDs (Conceptual Design) === | === Select LIDs (Conceptual Design) === | ||
In order to assess if the selected suite of BMPs effectively meet the design criteria | |||
either computer models or simple spreadsheet models should be used. Model selection | |||
will be based on the size and type of development. A wide range of simple to complex | |||
computer models such as Visual OTTHYMO, SWMM, SWMMHYNO, HSP-F and | |||
QUALHYMO are available. | |||
=== Assess Effectiveness === | === Assess Effectiveness === |
Revision as of 20:07, 12 September 2017
Process for selecting a suite of LID Options[edit]
Site Conditions[edit]
Define Design Criteria[edit]
A detailed description of the design criteria that need to be defined is provided in the
respective CVC and TRCA Stormwater Management Criteria documents. If outside jurisdictional
boundaries, criteria developed should have requirements to:
- preserve groundwater and baseflow characteristics;
- prevent undesirable and costly geomorphic changes in the watercourse;
- prevent any increases in flood risk potential;
- protect water quality; and ultimately,
- maintain an appropriate diversity of aquatic life and opportunities for human uses
The design criteria required to protect, enhance or restore the environmental resources
can be grouped under the following five categories.
- Flood Protection;
- Water Quality;
- Erosion Control;
- Recharge; and
- Natural Heritage Systems or green infrastructure
Screen Potential LID Options[edit]
A number of factors need to be considered when screening the suitability of a given
location within a development site for application of stormwater BMPs. Table 3.4.1
summarizes site constraints associated with some general types of structural LID
practices for stormwater management that should be considered. Further
information regarding constraints to the design of various end-of-pipe BMPs can be
found in the Ontario Ministry of the Environment Stormwater Management Planning and
Design Manual (2003). The use of LID BMPs should be considered first to meet the
design criteria before the use of end-of-pipe BMPs.
Structural Requirements or Site Constraints[edit]
Performance Requirements[edit]
Operations and Maintenance Requirements[edit]
Life Cycle Costing Requirements[edit]
Select LIDs (Conceptual Design)[edit]
In order to assess if the selected suite of BMPs effectively meet the design criteria
either computer models or simple spreadsheet models should be used. Model selection
will be based on the size and type of development. A wide range of simple to complex
computer models such as Visual OTTHYMO, SWMM, SWMMHYNO, HSP-F and
QUALHYMO are available.