Changes

Jump to navigation Jump to search
Line 29: Line 29:
* Natural Heritage Systems or green infrastructure
* Natural Heritage Systems or green infrastructure


=== Screen LID Options ===
=== Screen Potential LID Options ===
 
A number of factors need to be considered when screening the suitability of a given
 
location within a development site for application of stormwater BMPs. Table 3.4.1
 
summarizes site constraints associated with some general types of structural LID
 
practices for stormwater management that should be considered. Further
 
information regarding constraints to the design of various end-of-pipe BMPs can be
 
found in the Ontario Ministry of the Environment Stormwater Management Planning and
 
Design Manual (2003). The use of LID BMPs should be considered first to meet the
 
design criteria before the use of end-of-pipe BMPs.
 


==== Structural Requirements or Site Constraints ====
==== Structural Requirements or Site Constraints ====
187

edits

Navigation menu