Changes

Jump to navigation Jump to search
m
Line 56: Line 56:

==Finishing grades and surface layer installation==
==Finishing grades and surface layer installation==
This construction stage differs between LID practice types. The finishing grades and surface layer installation: vegetated LIDs page has guidance for vegetated LIDs, and the finishing grades and surface layer installation: permeable pavements has guidance for non-vegetated LIDs. In many cases the surface of infiltration systems will be traditional asphalt, concrete, or pavers; STEP does not provide guidance on installing non-permeable surfaces. For vegetated LIDs, see the finishing grades and surface layer installation: vegetated LIDs page for stage 
This construction stage differs between LID practice types. The finishing grades and surface layer installation: vegetated LIDs page has guidance for vegetated LIDs, and the finishing grades and surface layer installation: permeable pavements has guidance for non-vegetated LIDs. In many cases the surface of infiltration systems will be traditional asphalt, concrete, or pavers; STEP does not provide guidance on installing non-permeable surfaces.  


*soil media installation and soil amendment
*soil media installation and soil amendment
722

edits

Navigation menu