==Finishing grades and surface layer installation==
==Finishing grades and surface layer installation==
This construction stage differs between LID practice types. The finishing grades and surface layer installation: vegetated LIDs page has guidance for vegetated LIDs, and the finishing grades and surface layer installation: permeable pavements has guidance for non-vegetated LIDs. In many cases the surface of infiltration systems will be traditional asphalt, concrete, or pavers; STEP does not provide guidance on installing non-permeable surfaces.
This construction stage differs between LID practice types. The finishing grades and surface layer installation: vegetated LIDs page has guidance for vegetated LIDs, and the finishing grades and surface layer installation: permeable pavements has guidance for non-vegetated LIDs. In many cases the surface of infiltration systems will be traditional asphalt, concrete, or pavers; STEP does not provide guidance on installing non-permeable surfaces.
*soil media installation and soil amendment
*finish grading
*large stone and riprap
*plant verification and installation
*mulch placement
*stabilizing contributing drainage area and planting adjacent vegetation
*as-built survey
{| class="wikitable"
{| class="wikitable"
Line 72:
Line 64:
!Permeable pavements
!Permeable pavements
|-
|-
|*geotextile (if applicable)
|*soil media installation and soil amendments
| PP
| PP
|-
|-
|*underdrain
|*finish grading
| PP
| PP
|-
|-
|*impermeable liners
|*large stone and riprap
|PP
|PP
|-
|-
|*overflow
|*plant verification and installation
|PP
|PP
|-
|-
|*monitoring wells
|*mulch placement
|pp
|pp
|-
|-
|*storage reservoir
|*stabilizing contributing drainage area and planting adjacent vegetation
|PP
|PP
|-
|stone choker layer
|PP
|-
|curbing
|PP
|-
|*pre-treatment and inlet
|
|}
|}