==Phases of LID Construction==
==Phases of LID Construction==


[[File:Construction_Stages2.jpg|500 px|]]
'''1. Pre-Construction:'''
*Verification of design
*Tendering and contract
*Pre-construction inspection and protocols
*Mobilizing, access and perimeter controls
*Erosion and Sediment Control (ESC)
 
 
'''2. Construction:'''
*Excavation and mass grading
*Backfill granular and pipes
*Finish grades: inlet, outlet, biomedia and plants
 
'''3. Post-Construction:'''
*Address deficiencies
*Assumption protocols


==Why is inspection important for LID Construction?==
==Why is inspection important for LID Construction?==

Revision as of 17:00, 11 February 2022

Why is construction different?[edit]

Why problems occur?[edit]

Phases of LID Construction[edit]

1. Pre-Construction:

  • Verification of design
  • Tendering and contract
  • Pre-construction inspection and protocols
  • Mobilizing, access and perimeter controls
  • Erosion and Sediment Control (ESC)


2. Construction:

  • Excavation and mass grading
  • Backfill granular and pipes
  • Finish grades: inlet, outlet, biomedia and plants

3. Post-Construction:

  • Address deficiencies
  • Assumption protocols

Why is inspection important for LID Construction?[edit]