Difference between revisions of "Bioretention: Performances"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
Line 2: Line 2:


==Phosphorus Reduction==
==Phosphorus Reduction==
[[File:Bioretnetion TP.jpg|100px|thumb]]
[[File:Bioretnetion TP.jpg|200px|thumb]]
The performance results for [[Bioretention]] practices, located within TRCA's watershed originate from three primary sites:  
The performance results for [[Bioretention]] practices, located within TRCA's watershed originate from three primary sites:  
*Kortright Centre
*Kortright Centre

Revision as of 16:01, 30 January 2023

Phosphorus Reduction[edit]

Bioretnetion TP.jpg

The performance results for Bioretention practices, located within TRCA's watershed originate from three primary sites:

  • Kortright Centre
  • Earth Rangers
  • Seneca College
  • Central Parkway (Mississauga)
  • Wychwood Subdivision (Brampton)
  • IMAX Corporation, head office

The mean performance value recorded at the outlet for Bioretention practices' ability to remove Total Phosphorus (TP) was calculated based on 355 separate recordings between 2005-2007, 2011-2019 and 2021 amongst the six sites previously mentioned.

TSS Reduction[edit]

Bioretnetion TSS.jpg

The performance results for Bioretention practices, located within TRCA's watershed originate from three primary sites:

  • Kortright Centre
  • Earth Rangers
  • Seneca College
  • Central Parkway (Mississauga)
  • Wychwood Subdivision (Brampton)
  • IMAX Corporation, head office

The mean performance value recorded at the outlet for Bioretention practices' ability to remove Total Phosphorus (TP) was calculated based on 301 separate recordings between 2005-2007, 2011-2019 and 2021 amongst the sixsites previously mentioned.

Bioretnetion TP.jpg