=== Screen LID Options ===
=== Screen Potential LID Options ===
A number of factors need to be considered when screening the suitability of a given
location within a development site for application of stormwater BMPs. Table 3.4.1
summarizes site constraints associated with some general types of structural LID
practices for stormwater management that should be considered. Further
information regarding constraints to the design of various end-of-pipe BMPs can be
found in the Ontario Ministry of the Environment Stormwater Management Planning and
Design Manual (2003). The use of LID BMPs should be considered first to meet the
design criteria before the use of end-of-pipe BMPs.