All public logs
Jump to navigation
Jump to search
Combined display of all available logs of LID SWM Planning and Design Guide. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
(newest | oldest) View (newer 50 | older 50) (20 | 50 | 100 | 250 | 500)- 12:50, 2 August 2022 Kyle menken talk contribs created page Construction: erosion and sediment control inspection and maintenance (Created page with "===Erosion and sediment control inspection and maintenance=== ESC measures require ongoing attention to ensure integrity and performance. ESC inspections should take place, at minimum, during installation, after rainfall events, and at the critical inspection points discussed in the Pre-construction: communication, inspection plan, and utilities coordination section. At these inspections, keep an eye out for accumulated sediment, worn materials, compliance with the...")
- 13:18, 27 July 2022 SamanthaPelayo talk contribs created page Construction: tamping (Created blank page)
- 13:18, 27 July 2022 SamanthaPelayo talk contribs created page Construction: joint aggregate (Created blank page)
- 13:17, 27 July 2022 SamanthaPelayo talk contribs created page Construction: joint cutting (Created blank page)
- 16:09, 25 July 2022 DanielFilippi talk contribs created page File:Catchbasin isnert underground.PNG
- 16:09, 25 July 2022 DanielFilippi talk contribs uploaded File:Catchbasin isnert underground.PNG
- 15:59, 25 July 2022 DanielFilippi talk contribs created page File:LID-IM-Guide-7.5-Underground-Infiltration-Systems.pdf
- 15:59, 25 July 2022 DanielFilippi talk contribs uploaded File:LID-IM-Guide-7.5-Underground-Infiltration-Systems.pdf
- 15:34, 25 July 2022 DanielFilippi talk contribs created page File:Infiltration before cleanout infiltr.PNG
- 15:34, 25 July 2022 DanielFilippi talk contribs uploaded File:Infiltration before cleanout infiltr.PNG
- 15:10, 25 July 2022 DanielFilippi talk contribs created page File:Soakaway monitorign well.PNG
- 15:10, 25 July 2022 DanielFilippi talk contribs uploaded File:Soakaway monitorign well.PNG
- 14:54, 22 July 2022 Kyle menken talk contribs created page File:P1090179 SlingerTruck.JPG
- 14:54, 22 July 2022 Kyle menken talk contribs uploaded File:P1090179 SlingerTruck.JPG
- 13:48, 22 July 2022 SamanthaPelayo talk contribs created page File:P1160129.JPG
- 13:48, 22 July 2022 SamanthaPelayo talk contribs uploaded File:P1160129.JPG
- 19:06, 21 July 2022 DanielFilippi talk contribs created page File:Plan & profile view Infilt underground.PNG
- 19:06, 21 July 2022 DanielFilippi talk contribs uploaded File:Plan & profile view Infilt underground.PNG
- 18:58, 21 July 2022 SamanthaPelayo talk contribs created page Permeable pavements: Construction (Created page with "Add here your content!!")
- 18:46, 21 July 2022 DanielFilippi talk contribs created page Inspection and Maintenance: Underground Infiltration Systems (Created page with "thumb|750px|link=https://sustainabletechnologies.ca/app/uploads/2018/02/Underground-Infiltration-Systems-Fact-Sheet.pdf|Inspection & Maintenance Guidance of underground infiltration systems' best management practices that refers to LIDs that capture and temporarily store rainwater and snowmelt from hard surfaces (e.g., roofs and pavements) below ground in [[geotextile filter fabric lined excavations filled with washed gravel or oth...")
- 18:18, 21 July 2022 DanielFilippi talk contribs created page File:Cover page underground.PNG
- 18:18, 21 July 2022 DanielFilippi talk contribs uploaded File:Cover page underground.PNG
- 17:49, 21 July 2022 Kyle menken talk contribs created page File:ESC premature removal.jpg
- 17:49, 21 July 2022 Kyle menken talk contribs uploaded File:ESC premature removal.jpg
- 17:45, 21 July 2022 Kyle menken talk contribs created page File:ESC inlet supported.png
- 17:45, 21 July 2022 Kyle menken talk contribs uploaded File:ESC inlet supported.png
- 17:32, 21 July 2022 Kyle menken talk contribs created page File:ESC curb inlet (sediment has entered).jpg
- 17:32, 21 July 2022 Kyle menken talk contribs uploaded File:ESC curb inlet (sediment has entered).jpg
- 17:27, 21 July 2022 Kyle menken talk contribs uploaded a new version of File:ESC sacrificial fabric.png
- 17:25, 21 July 2022 Kyle menken talk contribs created page File:ESC sacrificial fabric.png
- 17:25, 21 July 2022 Kyle menken talk contribs uploaded File:ESC sacrificial fabric.png
- 16:26, 21 July 2022 DanielFilippi talk contribs created page File:P.p plan and profile view.PNG
- 16:26, 21 July 2022 DanielFilippi talk contribs uploaded File:P.p plan and profile view.PNG
- 16:25, 21 July 2022 DanielFilippi talk contribs created page File:Single ring infilt p.p.PNG
- 16:25, 21 July 2022 DanielFilippi talk contribs uploaded File:Single ring infilt p.p.PNG
- 16:20, 21 July 2022 DanielFilippi talk contribs created page File:Permeable Pavements inspection sheet.pdf
- 16:20, 21 July 2022 DanielFilippi talk contribs uploaded File:Permeable Pavements inspection sheet.pdf
- 16:18, 21 July 2022 SamanthaPelayo talk contribs created page Construction: stabilizing contributing drainage area (Created page with "150px|thumb|right|Natural lawn grass installed to stabilize the contributing drainage area at the Glendale P.S. rain garden in Brampton, Ontario. Similar to the plant material verification and installation task shown above, any planting required to stabilize the contributing drainage area will need to meet the specifications and considerations shown above.<br> Additionally, if turf/grass is required to stabilize the contributing drainage area, in...")
- 16:18, 21 July 2022 SamanthaPelayo talk contribs created page Construction: mulch placement (Created page with "Wood mulch provides numerous functions to a bioretention practice including reducing soil erosion, filtration, protecting underlying soils from compaction, retaining moisture, and minimizing volunteer weed establishment. Communicate to contractor how to install and the mulch type in the plans and or specifications with notes, details, spot elevations, and other special features needed as per designed. Equipment recommended for this task can be: *Automated: Mulch blowers...")
- 16:17, 21 July 2022 SamanthaPelayo talk contribs created page Construction: plant material verification and installation (Created page with "thumb|right|CVC staff planting plant material at Our Lady of Fatima Catholic School in Brampton, Ontario. A healthy and vibrant vegetation structure provides itself with nutrients to sustain growth. Additionally, it holds, and retains water and oxygen, and binds and degrades pollutants. When selecting plants, consider the following: *Native species need fewer inputs and are better adapted to local climate and soils. *Larger plant stock should...")
- 16:15, 21 July 2022 SamanthaPelayo talk contribs created page Construction: large stone and riprap (Created page with "Riprap serves as a protective layer to: prevent sediment entering the underlying layers and clogging the LID facility, dissipate stormwater energy, and stabilize the terrain and slope. '''Construction Steps:''' #Backfill the material from the outside of the LID facility to avoid compaction. #Ensure the material is being placed to the elevation and thickness to the design requirements. '''Key Inspection Points:''' *Arrival of material to the site: material meets specif...")
- 16:14, 21 July 2022 SamanthaPelayo talk contribs created page Construction: finish grading (Created page with "The finish grading process is another critical handoff moment as a number of elements such as curbs, sidewalks, soils and vegetation start to come together to create the functional and aesthetic value of a site. The same supervision and communication that was put into controlling ESC in earlier stages is also required during finish grading. In many cases, more attention to detail is needed for elements in this phase that will create or not the success of the final produc...")
- 16:12, 21 July 2022 SamanthaPelayo talk contribs created page Construction: soil media and amendment (Created page with "Bioretention can be constructed over any soil type, but hydrologic soil group A and B are best for achieving water balance objectives. Facilities designed to infiltrate water should be located on portions of the site with the highest infiltration rates. STEP has detailed construction guidance on soil amendments available on its https://sustainabletechnologies.ca/home/urban-runoff-green-infrastructure/healthy-soils/construction-specifications-for-implementing-compost-am...")
- 16:09, 21 July 2022 SamanthaPelayo talk contribs created page Construction: pretreatment and inlet (Created page with "Pre-treatment structures are most cost effective when they slow down incoming flows, collect sediment for easy clean out, and slowly release water to the bioretention facility mitigating erosion. Pretreatment structures/strategies can include curb cuts, Aggregates, proprietary devices like filters or hydrodynamic separators, vegetation, concrete sumps, membrane filters, overland flow sumps, etc. '''Construction Steps:''' *Installation of pre-treatment fea...")
- 16:07, 21 July 2022 SamanthaPelayo talk contribs created page Construction: curbing (Created page with ""'INSERT VIDEO FROM HAGGERT AVE: \\Hqcvcfs01\cvc2\Watershed Management\Integrated Water Management Implementation\Fletchers Creek SNAP\Haggert Ave Road Retrofit\3 - Photos\Construction Photos\Site Visit_20201120\Riverstone Construction Haggert Ave Inlet_F.mp4'' It is very important to make sure that the contractor responsible for curb construction understands curb cut designs and elevations. This is often a new technique for contractors, and they may not understand...")
- 16:05, 21 July 2022 SamanthaPelayo talk contribs created page Construction: stone choker layer (Created page with "''INSERT VIDEO: K:\Watershed Management\Integrated Water Management Implementation\Fletchers Creek SNAP\Haggert Ave Road Retrofit\3 - Photos\Construction Overview Presentation\Video--> HaggertAve_Final.MP4'' In LID facilities, a choker layer of ≥ 100 mm depth is recommended to prevent migration of finer filter media into the underlying storage reservoir aggregate. Similar to the storage reservoir material, this aggregate layer should be a washed 5 – 10 mm stone not...")
- 16:02, 21 July 2022 SamanthaPelayo talk contribs created page Construction: storage reservoir (Created page with "''INSERT YOUTUBE LINK: https://www.youtube.com/watch?v=Ng_s2ErvPqk&t=58s <br>'' The storage reservoir layer holds and directs the stormwater into the underlying/native soils. The LID facilities, if applicable, should be filled with uniformly graded, washed stone (20 mm – 50 mm) that provides 30 to 40% void space. ‘’’Construction steps:’’’ #Backfill material from outside of the LID facility to avoid compaction and sediment entering the facilities. Use a s...")
- 15:30, 21 July 2022 DanielFilippi talk contribs created page File:Minimum & hig hfreq cost p.p.PNG
- 15:30, 21 July 2022 DanielFilippi talk contribs uploaded File:Minimum & hig hfreq cost p.p.PNG
- 15:29, 21 July 2022 DanielFilippi talk contribs created page File:Minimum & hig hfrequency costs.pp.JPG