| ==Determine the required surface area of the storage reservoir== | | ==Determine the required surface area of the storage reservoir== |
| * Step 13: Calculate the surface area of the storage reservoir, A<sub>r</sub> (m<sup>2</sup>) needed to capture the infiltration volume target for the design storm event <br> | | * Step 13: Calculate the surface area of the storage reservoir, A<sub>r</sub> (m<sup>2</sup>) needed to capture the infiltration volume target for the design storm event: <math>A_{r}=V_{i}/[d_{i}+(f'\times D)]</math> |
| For practices with no underdrain:
| |
| <math>A_{r}=V_{i}/[d_{i}+(f'\times D)]</math> | |
| {{Plainlist|1=Where: | | {{Plainlist|1=Where: |
| *V<sub>i</sub> = Infiltration volume target for the design storm event (m<sup>3</sup>), based on average annual water budgets for pre- and post-development scenarios, and the target of maintaining pre-development infiltration volume. | | *V<sub>i</sub> = Infiltration volume target for the design storm event (m<sup>3</sup>), based on average annual water budgets for pre- and post-development scenarios, and the target of maintaining pre-development infiltration volume. |
Line 154: |
Line 152: |
| *D= Duration of design storm (h)<br> | | *D= Duration of design storm (h)<br> |
| <br> | | <br> |
| | *Step 14: Calculate the required storage reservoir depth, d<sub>r</sub> (m): |
| | <math>d_{r}=d_{i}\times 1/n_{r}'</math> |
| | {{Plainlist|1=Where: |
| | *d<sub>i</sub>' = Design infiltration water storage depth (m) |
| | *n<sub>r</sub>' = Effective porosity of the storage reservoir fill material(s), depth-weighted mean of all components. |
| | *f' = Design infiltration rate of the underlying native soil (m/h)<br> |
| | |
|
| |
|
| ==Calculate peak flow rates== | | ==Calculate peak flow rates== |
| * Step 13. Calculate the peak [[flow through perforated pipe|flow rate through the perforated pipe]], | | * Step 14. Calculate the peak [[flow through perforated pipe|flow rate through the perforated pipe]], |
| * Step 14. Calculate the peak [[flow through media|flow rate through the filter media]], | | * Step 16. Calculate the peak [[flow through media|flow rate through the filter media]], |
| * Step 15. Determine if downstream [[flow control]] is required to achieve hydrologic objectives. | | * Step 17. Determine if downstream [[flow control]] is required to achieve hydrologic objectives. |
|
| |
|
| ===Calculating infiltration practice drainage in 1 dimension=== | | ===Calculating infiltration practice drainage in 1 dimension=== |