Line 154:
Line 154:
*D= Duration of design storm (h)<br>
*D= Duration of design storm (h)<br>
<br>
<br>
*Step 13: Calculate practice drainage time, t<sub>p</sub> (h), which is the time required to fully drain d<sub>i</sub> or d<sub>i</sub>' assuming one dimensional drainage from the storage reservoir bottom:
==Calculate peak flow rates==
==Calculate peak flow rates==