Changes

Jump to navigation Jump to search
Line 36: Line 36:

===Space===  
===Space===  
*For optimal performance bioretention facilities should receive runoff from impervious drainage areas between 5 to 20 times their own permeable surface area.  
*For optimal performance bioretention facilities should receive runoff from impervious drainage areas between 5 to 20 times their own permeable footprint surface area.  
*In the conceptual design stage it is recommended to set aside approximately 10 - 20 % of the contributing drainage area for bioretention facility placement.  
*In the conceptual design stage it is recommended to set aside approximately 10 - 20 % of the contributing drainage area for bioretention facility placement.  
*Bioretention cells work best when distributed, so that no one facility receives runoff from more than 0.8 Ha, although there is a trade off to be considered regarding distributed collection and treatment against ease of maintenance.  
*Bioretention cells work best when distributed, so that no one facility receives runoff from more than 0.8 Ha, although there is a trade off to be considered regarding distributed collection and treatment against ease of maintenance.  

Navigation menu