Changes

Jump to navigation Jump to search
no edit summary
Line 228: Line 228:
*Material arrival to the site: meets specifications as per design, no debris in the aggregate, washed or clean aggregate with little to no fine materials
*Material arrival to the site: meets specifications as per design, no debris in the aggregate, washed or clean aggregate with little to no fine materials
*When placing the storage reservoir material, ensure that no damage occurs to the underdrain utilities.<br>   
*When placing the storage reservoir material, ensure that no damage occurs to the underdrain utilities.<br>   
{{float right|{{#widget:YouTube|id=6D0lrz85mqk}}}}


Mistakes to Avoid<br>     
Mistakes to Avoid<br>     

Navigation menu