Construction Steps<br>     
Construction Steps<br>     
 
*Backfill material from outside of the LID facility to avoid compaction and sediment entering the facilities.
 
*Place material to the elevation and thickness as per the design specifications<br>


Key Inspection Points<br>     
Key Inspection Points<br>     
*Material arrival to the site: meets specifications as per design, no debris in the aggregate, washed or clean aggregate with little to no fine materials
*When placing the storage reservoir material, ensure that no damage occurs to the underdrain utilities.<br> 


 
{{float right|{{#widget:YouTube|id=6D0lrz85mqk}}}}


Mistakes to Avoid<br>     
Mistakes to Avoid<br>     
*Accepting material that does not meet design requirements and specifications
*Install material with heavy equipment from the inside of the LID facility


 
For more information on the storage reservoir, see the page: [[Reservoir aggregate]]<br>
For more information on geotextiles, see the page: [[Reservoir aggregate]]<br>


'''Stone Choker  Layer'''<br>     
'''Stone Choker  Layer'''<br>     