It is very important to make sure that the contractor responsible for curb construction understands curb cut designs and elevations. This is often a new technique for contractors and they may not understand the overall concept of water in the gutter line being directed behind the gutter. <br>  
It is very important to make sure that the contractor responsible for curb construction understands curb cut designs and elevations. This is often a new technique for contractors and they may not understand the overall concept of water in the gutter line being directed behind the gutter. <br>  


Construction Steps<br>   
Construction Steps:<br>   
add {{    <br>
add {{    <br>
float right | {{ # widget: YouTube | id=nWV2foAEzt0
float right | {{ # widget: YouTube | id=nWV2foAEzt0
Line 325: Line 325:
#Let concrete cure according to its specifications (CSA A23.1-09) and curing time.
#Let concrete cure according to its specifications (CSA A23.1-09) and curing time.


*Use the right forms to pour concrete
Key Inspection Points:<br>     
*Let concrete cure according to its specifications and curing time
 
 
 
Key Inspection Points<br>     
*When pouring the concrete, making sure that the concrete truck is not inside the LID facility
*When pouring the concrete, making sure that the concrete truck is not inside the LID facility
*
*