Changes

Jump to navigation Jump to search
m
Line 126: Line 126:
|}
|}


[[File:Fail bio.PNG|280px|thumb|center|]]
 


'''Tendering and contract''' <br>
'''Tendering and contract''' <br>
Line 152: Line 152:
|[[File:Fail bio.PNG|280px|thumb|center|Size of the CDA has changed from design assumptions. A point source for contaminants is visible (i.e. lack of sediment controls on adjacent construction site). (Photo Source: North Carolina Cooperative Extension)]]  
|[[File:Fail bio.PNG|280px|thumb|center|Size of the CDA has changed from design assumptions. A point source for contaminants is visible (i.e. lack of sediment controls on adjacent construction site). (Photo Source: North Carolina Cooperative Extension)]]  
|}
|}
[[File:Fail bio.PNG|280px|thumb|center|]]
[[File:ESC perpendicular grooves.jpg|280px|thumb|center]]
[[File:Scarification.JPG|400px|thumb|right]]
[[File:Stockpile in gutter.jpg|500px|thumb|If it were to rain, fines from this stockpile would go straight into the downstream catchbasin|left]]


'''ESC Inspection and Maintenance'''<br>
'''ESC Inspection and Maintenance'''<br>
722

edits

Navigation menu