Changes
Jump to navigation
Jump to search
← Older edit
Newer edit →
Construction: finish grading
(view source)
Revision as of 16:14, 21 July 2022
1 byte added
,
2 years ago
no edit summary
Line 2:
Line 2:
'''Construction steps:'''
'''Construction steps:'''
Soil Media:
*
Soil Media:
*
Backfill or sling material from outside of the LID facility at the lowest possible speed to avoid loss of component material.
#
Backfill or sling material from outside of the LID facility at the lowest possible speed to avoid loss of component material.
*
Apply material in 150-300 mm lifts until the desired elevation and thickness, allowing for positive flow.
#
Apply material in 150-300 mm lifts until the desired elevation and thickness, allowing for positive flow.
*
Wet material between lifts, allowing for drying before backfilling/slinging another lift.
#
Wet material between lifts, allowing for drying before backfilling/slinging another lift.
SamanthaPelayo
502
edits
Navigation menu
Personal tools
Log in
Namespaces
Page
Discussion
Variants
expanded
collapsed
Views
Read
View source
View history
More
expanded
collapsed
Search
Navigation
Home
Table of contents
All pages
Recent changes
Responses to comments
Tools
Special pages
Printable version