'''Construction steps:'''
'''Construction steps:'''
Soil Media:
*Soil Media:
*Backfill or sling material from outside of the LID facility at the lowest possible speed to avoid loss of component material.
#Backfill or sling material from outside of the LID facility at the lowest possible speed to avoid loss of component material.
*Apply material in 150-300 mm lifts until the desired elevation and thickness, allowing for positive flow.
#Apply material in 150-300 mm lifts until the desired elevation and thickness, allowing for positive flow.
*Wet material between lifts, allowing for drying before backfilling/slinging another lift.
#Wet material between lifts, allowing for drying before backfilling/slinging another lift.