Changes

Jump to navigation Jump to search
m
Line 25: Line 25:
{{:Construction: storage reservoir}}
{{:Construction: storage reservoir}}


==Permeable pavement guidance==
==Permeable pavement sub-base and base course==


Because permeable pavements may be required to support heavy loads (driveways, laneways, etc.), the sub-base and base course may require compaction to prevent heaving and shifting.
Because permeable pavements may be required to support heavy loads (driveways, laneways, etc.), the sub-base and base course may require compaction to prevent heaving and shifting.
722

edits

Navigation menu