Line 26: Line 26:

=Key construction steps=
=Key construction steps=
{| class="wikitable"
|+ Stage 4 guidance for vegetated LIDs and permeable pavements
|-
!LID practices with vegetated surfaces
!Permeable pavements
|-
|soil media installation and soil amendments
|bedding layer
|-
|finish grading
|placement and finishing
|-
|large stone and riprap
|paver installation
|-
|plant verification and installation
|tamping
|-
|mulch placement
|joint cutting
|-
|stabilizing contributing drainage area and planting adjacent vegetation
|joint aggregate
|-
| --
|curbing
|-
| --
|stabilizing contributing drainage area
|}


===Modular system===