Changes

Jump to navigation Jump to search
no edit summary
Line 33: Line 33:

<gallery mode="packed" widths=300px heights=300px>
<gallery mode="packed" widths=300px heights=300px>
Alton-chamber.JPG | Chamber resting on top of scour fabric at Alton Main Street (Photo Source: CVC, 2019).
Alton-chamber.JPG | Chamber resting on top of scour fabric at Alton Main Street. (Photo Source: CVC, 2019)
20170605_164302.jpg | Components of an infiltration chamber being overlapped (Photo Source: CVC, n.d.).
20170605_164302.jpg | Components of an infiltration chamber being overlapped. (Photo Source: CVC, n.d.)
East_Gwillimbury.png | Example of "crate style" Infiltration chambers being installed in East Gwillimbury. (Photo Source: [https://www.makeway.ca/products/stormwater-management-systems/ Make-Way Environmental Technologies Inc. Makeway Environmental Technologies Inc.])<ref>Makeway Environmental Technologies Inc. 2022. Stormwater Management. Photo. Accessed September 30, 2022: https://www.makeway.ca/products/stormwater-management-systems/</ref>
East_Gwillimbury.png | Example of "crate style" Infiltration chambers being installed in East Gwillimbury. (Photo Source: [https://www.makeway.ca/products/stormwater-management-systems/ Make-Way Environmental Technologies Inc. Makeway Environmental Technologies Inc.])<ref>Makeway Environmental Technologies Inc. 2022. Stormwater Management. Photo. Accessed September 30, 2022: https://www.makeway.ca/products/stormwater-management-systems/</ref>


Line 42: Line 42:
ADS-manifold.jpg | Manifold connecting to infiltration chamber rows. (Photo Source:[https://www.adspipe.com/water-management-solutions/detention-infiltration Advanced Drainage Systems])<ref>Advanced Drainage Systems. 2022. StormTech Isolator Row PLUS. Photo. Accessed September 30, 2022: https://www.adspipe.com/water-management-solutions/detention-infiltration/isolator-row</ref>
ADS-manifold.jpg | Manifold connecting to infiltration chamber rows. (Photo Source:[https://www.adspipe.com/water-management-solutions/detention-infiltration Advanced Drainage Systems])<ref>Advanced Drainage Systems. 2022. StormTech Isolator Row PLUS. Photo. Accessed September 30, 2022: https://www.adspipe.com/water-management-solutions/detention-infiltration/isolator-row</ref>
Scour-fabric.jpg | Scour fabric rolled out below an infiltration chamber during assembly. (Photo Source: [https://assets.ads-pipe.com/m/770e887b972da86f/original/SC-160LP-SC-310-SC-740-DC-780-StormTech-Design-Manual.pdf Advanced Drainage Systems])<ref>Advanced Drainage Systems. 2022. SC-160LP, SC-310, SC-740 & DC-780 Design Manual. Photo. Accessed September 30, 2022: https://assets.ads-pipe.com/m/770e887b972da86f/original/SC-160LP-SC-310-SC-740-DC-780-StormTech-Design-Manual.pdf</ref>
Scour-fabric.jpg | Scour fabric rolled out below an infiltration chamber during assembly. (Photo Source: [https://assets.ads-pipe.com/m/770e887b972da86f/original/SC-160LP-SC-310-SC-740-DC-780-StormTech-Design-Manual.pdf Advanced Drainage Systems])<ref>Advanced Drainage Systems. 2022. SC-160LP, SC-310, SC-740 & DC-780 Design Manual. Photo. Accessed September 30, 2022: https://assets.ads-pipe.com/m/770e887b972da86f/original/SC-160LP-SC-310-SC-740-DC-780-StormTech-Design-Manual.pdf</ref>
Alton-Envirohood.jpg | A storm chamber inlet protected from debride by an envirohood. It is essential that the top of the chamber is lower in elevation than any other outlets from the catchbasin. This is because the chamber’s capacity should be fully utilized before runoff is allowed to travel farther downstream (Photo Source: CVC, 2022).
Alton-Envirohood.jpg | A storm chamber inlet protected from debride by an envirohood. It is essential that the top of the chamber is lower in elevation than any other outlets from the catchbasin. This is because the chamber’s capacity should be fully utilized before runoff is allowed to travel farther downstream. (Photo Source: CVC, 2022)


</gallery>
</gallery>
426

edits

Navigation menu