Changes

Jump to navigation Jump to search
Line 56: Line 56:
*'''External Temperature Below 20°C:''' Priority is placed on ensuring the cistern is filled with enough rainwater to supply toilets. Roof surface readily drains roof water to the basement.  
*'''External Temperature Below 20°C:''' Priority is placed on ensuring the cistern is filled with enough rainwater to supply toilets. Roof surface readily drains roof water to the basement.  
*'''External Temperature Above 20°C:''' Priority is placed on maximizing evaporative cooling benefits. Rainwater depth on the roof is maximized and rainwater is not drained to the basement cistern. If the basement cistern is empty, municipal water is used in the toilets.
*'''External Temperature Above 20°C:''' Priority is placed on maximizing evaporative cooling benefits. Rainwater depth on the roof is maximized and rainwater is not drained to the basement cistern. If the basement cistern is empty, municipal water is used in the toilets.
 
Data is transmitted to the PLC from the various sensors, and these data streams are uploaded to CVC’s existing WISKI database to calculate key performance indicators (KPI’s). Some of the KPI’s for the SBR include the following:
Data is transmitted to the PLC from the various sensors, and these data streams are uploaded to CVC’s existing WISKI database to calculate key performance indicators (KPI’s). Some of the KPI’s for the SBR include the following:


426

edits

Navigation menu