User contributions for Dean Young
Jump to navigation
Jump to search
- 04:12, 10 July 2020 diff hist +5 Choker layer
- 04:08, 10 July 2020 diff hist 0 Bioretention →Plant Selection
- 04:05, 10 July 2020 diff hist +2 Bioretention →Plant Selection
- 04:05, 10 July 2020 diff hist 0 Bioretention →Plant Selection
- 04:04, 10 July 2020 diff hist −7 Bioretention →Plant Selection
- 04:02, 10 July 2020 diff hist +41 Bioretention →Plant Selection
- 03:58, 10 July 2020 diff hist −4 Bioretention →Plant Selection
- 03:57, 10 July 2020 diff hist +29 Freeboard current
- 03:55, 10 July 2020 diff hist +25 Freeboard
- 03:51, 10 July 2020 diff hist 0 Overflow →Overflow Outlet Options
- 03:51, 10 July 2020 diff hist +16 Overflow →Options
- 03:50, 10 July 2020 diff hist −204 Freeboard
- 03:44, 10 July 2020 diff hist −41 Overflow →Overflow elevation
- 03:43, 10 July 2020 diff hist +107 Overflow →Overflow elevation
- 03:34, 10 July 2020 diff hist +127 Overflow →Routing
- 03:28, 10 July 2020 diff hist −133 Overflow →Routing
- 03:15, 10 July 2020 diff hist +1 Bioretention →Design
- 03:07, 10 July 2020 diff hist +30 Bioretention →Private sites
- 03:04, 10 July 2020 diff hist +32 Bioretention →Space
- 02:58, 10 July 2020 diff hist +1 Bioretention →Overview
- 02:55, 10 July 2020 diff hist +63 Bioretention →Overview
- 02:47, 10 July 2020 diff hist 0 Bioretention →Overview
- 02:47, 10 July 2020 diff hist +67 Bioretention →Overview
- 19:43, 3 June 2020 diff hist −1 Groundwater →Groundwater mounding
- 19:42, 3 June 2020 diff hist +5 Drainage time →Calculating infiltration practice drainage time current
- 19:42, 3 June 2020 diff hist −6 Bioretention: Sizing →Groundwater mounding
- 19:41, 3 June 2020 diff hist −5 Bioretention: Sizing →Groundwater mounding
- 19:41, 3 June 2020 diff hist +10 Bioretention: Sizing →Groundwater mounding
- 19:40, 3 June 2020 diff hist −16 Bioretention: Sizing →Calculate peak flow rates
- 19:40, 3 June 2020 diff hist +24 Bioretention: Sizing →Calculate peak flow rates
- 21:24, 2 June 2020 diff hist +3 Infiltration: Sizing and modeling →Time to drain the storage reservoir
- 21:23, 2 June 2020 diff hist 0 Infiltration: Sizing and modeling →Time to drain the storage reservoir
- 21:23, 2 June 2020 diff hist +23 Infiltration: Sizing and modeling →Time to drain the storage reservoir
- 21:21, 2 June 2020 diff hist +3 Infiltration: Sizing and modeling →Time required to drain surface ponded water (1D drainage)
- 21:21, 2 June 2020 diff hist +3 Infiltration: Sizing and modeling →Time required to drain surface ponded water (1D drainage)
- 21:20, 2 June 2020 diff hist +35 Infiltration: Sizing and modeling →To calculate the required storage reservoir depth, where the area is fixed or constrained (3D drainage)
- 21:19, 2 June 2020 diff hist +4 Infiltration: Sizing and modeling →To calculate the required storage reservoir depth, where the area is fixed or constrained (3D drainage)
- 21:18, 2 June 2020 diff hist +4 Infiltration: Sizing and modeling →To calculate the required storage reservoir depth where the area is fixed or constrained (1D drainage)
- 21:18, 2 June 2020 diff hist +2 Infiltration: Sizing and modeling →To calculate the required storage reservoir footprint area where the depth is fixed or constrained (1D drainage)
- 21:17, 2 June 2020 diff hist +29 Infiltration: Sizing and modeling →To calculate the required storage reservoir footprint area where the depth is fixed or constrained (1D drainage)
- 21:15, 2 June 2020 diff hist +1 Infiltration: Sizing and modeling →To calculate the required storage reservoir footprint area where the depth is fixed or constrained (1D drainage)
- 21:13, 2 June 2020 diff hist −1 Bioretention: Sizing →Determine the infiltration water storage depth of the practice
- 21:13, 2 June 2020 diff hist +1 Bioretention: Sizing →Determine the infiltration water storage depth of the practice
- 21:10, 2 June 2020 diff hist −35 Bioretention: Sizing →Determine the required surface area of the practice
- 21:07, 2 June 2020 diff hist +6 Bioretention: Sizing
- 21:02, 2 June 2020 diff hist +4 Bioretention: Sizing and modeling →Size a bioretention cell where drainage area and practice area are fixed current
- 21:01, 2 June 2020 diff hist +74 Bioretention: Sizing and modeling
- 20:43, 2 June 2020 diff hist +10 Bioretention: Sizing →Calculate the total depth of the practice, dT
- 20:42, 2 June 2020 diff hist +110 Bioretention: Sizing →Calculate the total depth of the practice, dT
- 20:37, 2 June 2020 diff hist −32 Bioretention: Sizing and modeling →Size a bioretention cell receiving flows directly to the storage reservoir for a constrained depth