User contributions for Kyle menken
Jump to navigation
Jump to search
- 18:39, 21 July 2022 diff hist 0 m Construction: erosion and sediment control measures →Erosion and sediment control measures
- 18:39, 21 July 2022 diff hist 0 m Construction: erosion and sediment control measures →Erosion and sediment control measures
- 18:36, 21 July 2022 diff hist −2 m Construction: tendering and contract →Tendering and contract
- 18:14, 21 July 2022 diff hist −2 m Bioretention: Construction →Backfill Granular and Pipes (JC)
- 18:09, 21 July 2022 diff hist +19 m Design verification and site walk-through →Design verification and site walk-through
- 18:09, 21 July 2022 diff hist −7 m Bioretention: Construction →Pre-Construction (KM)
- 18:07, 21 July 2022 diff hist −2 m Design verification and site walk-through →Design verification and site walk-through Tag: Manual revert
- 18:05, 21 July 2022 diff hist +2 m Design verification and site walk-through →Design verification and site walk-through Tag: Manual revert
- 18:00, 21 July 2022 diff hist +145 m Construction: erosion and sediment control measures →Erosion and sediment control measures
- 17:52, 21 July 2022 diff hist +70 m Construction: erosion and sediment control measures →Erosion and sediment control measures
- 17:50, 21 July 2022 diff hist +374 m Construction: erosion and sediment control measures →Erosion and sediment control measures
- 17:49, 21 July 2022 diff hist 0 N File:ESC premature removal.jpg current
- 17:45, 21 July 2022 diff hist 0 N File:ESC inlet supported.png current
- 17:35, 21 July 2022 diff hist +266 m Construction: erosion and sediment control measures
- 17:32, 21 July 2022 diff hist 0 N File:ESC curb inlet (sediment has entered).jpg current
- 17:27, 21 July 2022 diff hist 0 File:ESC sacrificial fabric.png Kyle menken uploaded a new version of File:ESC sacrificial fabric.png current
- 17:25, 21 July 2022 diff hist 0 N File:ESC sacrificial fabric.png
- 15:03, 21 July 2022 diff hist −2 m Design verification and site walk-through →Design verification and site walk-through
- 15:03, 21 July 2022 diff hist +150 m Construction: erosion and sediment control measures →Erosion and sediment control measures
- 14:59, 21 July 2022 diff hist −148 m Bioretention: Construction →Pre-Construction (KM)
- 14:58, 21 July 2022 diff hist −1,240 m Bioretention: Construction →Pre-Construction (KM)
- 14:58, 21 July 2022 diff hist +45 m Construction: erosion and sediment control measures
- 14:54, 21 July 2022 diff hist +20 m Construction: erosion and sediment control measures
- 14:53, 21 July 2022 diff hist +19 m Construction: erosion and sediment control measures
- 14:53, 21 July 2022 diff hist +924 m Construction: erosion and sediment control measures
- 14:37, 21 July 2022 diff hist 0 N File:ESC doubled up.png current
- 14:21, 21 July 2022 diff hist +2,554 N Construction: erosion and sediment control measures Created page with "Establish required perimeter controls, including erosion and sediment control (ESC) measures, prior to construction and adjust accordingly during construction. ESC measures come in two basic types: structural ESC, which slows and holds runoff from the disturbed area, dissipating erosive forces, promoting ponding, and allowing suspended particles to settle out; and non-structural ESC, which primarily minimizes the exposure time of stripped soils. STEP’s Erosion and Sedi..."
- 14:19, 21 July 2022 diff hist 0 N File:ESC insufficient support.JPG current
- 13:55, 21 July 2022 diff hist +142 m Construction: excavation and rough grade
- 13:51, 21 July 2022 diff hist 0 N File:Excavation outside in 2.JPG current
- 13:14, 21 July 2022 diff hist +44 m Construction: clearing and grubbing →Clearing and grubbing
- 13:08, 21 July 2022 diff hist +73 m Bioretention: Construction →Pre-Construction (KM)
- 13:06, 21 July 2022 diff hist +1,208 N Construction: mobilization, access, staging, and perimeter controls Created page with "===Mobilization, access, staging, and perimeter controls=== In tandem with installation of ESC measures, setting up access and staging areas is one of the first steps in any construction project. Perimeter controls such as construction fencing are often combined with silt fencing. Safety fencing may be needed to restrict public access to the site, especially if the site sees lots of pedestrian traffic. Together, construction fencing and structural ESC measures should dem..."
- 12:41, 21 July 2022 diff hist −26 m Bioretention: Construction →Excavation and Mass Grading (KM)
- 12:40, 21 July 2022 diff hist +896 N Construction: final excavated grade and verification Created page with "===Final excavated grade and verification=== LID designs typically have very specific grading requirements. Verifying depths and slopes is critical for optimal performance of the facility. For example, if the design calls for a channel with a 1 % slope, the channel may not function as designed if it has a 2 % slope instead. Similarly, if the designs call for 1 metre of excavation from grade and only 90 cm are excavated, it will not have enough storage space to meet the d..."
- 12:24, 21 July 2022 diff hist −2 m Construction: communication, inspection plan, and utilities coordination →Communication, inspection plan, and utilities coordination
- 12:21, 21 July 2022 diff hist −2 m Construction: tendering and contract →Tendering and contract
- 12:21, 21 July 2022 diff hist −2 m LID construction notes →LID construction notes
- 12:19, 21 July 2022 diff hist −2 m Design verification and site walk-through →Design verification and site walk-through
- 18:27, 20 July 2022 diff hist +6 m Bioretention: Construction →Excavation and Mass Grading (KM)
- 17:49, 20 July 2022 diff hist +2,101 N Construction: excavation and rough grade Created page with "===Excavation and rough grade=== Excavation to the specified depths in the drawings is critical to the LID feature’s future performance. It also requires heavy machinery which, if used incorrectly, can compact soils and lower their native infiltration rates. <br/> '''Construction steps''' #Mark out the limit of excavation. #Use predefined access routes to move heavy equipment. #Cut and stabilize access and staging areas. #Cut and stabilize channels and slopes. #Excavat..."
- 17:39, 20 July 2022 diff hist −2 m Construction: clearing and grubbing →Clearing and grubbing
- 17:28, 20 July 2022 diff hist +10 m Bioretention: Construction →Excavation and Mass Grading (KM)
- 17:26, 20 July 2022 diff hist +1,318 N Construction: clearing and grubbing Created page with "====Clearing and grubbing==== Clearing and grubbing is the stripping of vegetation and topsoil prior to excavation and rough grading within designated areas. '''Construction steps''' #Clear trees, large shrubs, stumps, etc. (grubbing). #Use appropriately sized machinery (e.g. a mini-excavator) to strip sod and ground-level vegetation (clearing). #Stockpile materials within designated areas if necessary. If the materials are being hauled offsite, stripped materials idea..."
- 17:04, 20 July 2022 diff hist −11 m Construction: communication, inspection plan, and utilities coordination →Communication, inspection plan, and utilities coordination
- 16:41, 20 July 2022 diff hist +10 m Construction: tendering and contract →Minimum contractor requirements
- 16:40, 20 July 2022 diff hist +68 m Construction: communication, inspection plan, and utilities coordination
- 16:37, 20 July 2022 diff hist −7 m Construction: tendering and contract →Tendering and contract
- 16:31, 20 July 2022 diff hist −20 m LID construction notes →LID construction notes
- 18:27, 19 July 2022 diff hist +169 m Construction: communication, inspection plan, and utilities coordination →Inspection plan