LID Construction
Revision as of 18:58, 11 February 2022 by SamanthaPelayo (talk | contribs)
Why is construction different?[edit]
Why problems occur?[edit]
Phases of LID Construction[edit]
1. Pre-Construction:
- Verification of design
- Tendering and contract
- Pre-construction inspection and protocols
- Mobilizing, access and perimeter controls
- Erosion and Sediment Control (ESC)
2. Construction:
- Excavation and mass grading
- Backfill granular and pipes
- Finish grades: inlet, outlet, biomedia and plants
3. Post-Construction:
- Address deficiencies
- Assumption protocols
Why is inspection important for LID Construction?[edit]
Construction Guidance[edit]