Changes

Jump to navigation Jump to search
no edit summary
Line 17: Line 17:
*An [[underdrain]] to redistribute or remove excess water  
*An [[underdrain]] to redistribute or remove excess water  
*An [[Liner|impermeable membrane]] to prevent infiltration to soils below
*An [[Liner|impermeable membrane]] to prevent infiltration to soils below
==Planning considerations==
==Planning considerations==
<h3>Space</h3>  
<h3>Space</h3>  
Line 43: Line 42:
<h3>Sizing</h3>
<h3>Sizing</h3>
{{:Bioretention: Sizing and modeling}}  
{{:Bioretention: Sizing and modeling}}  
<br>If additional storage volume is desired beneath an underdrain pipe, this may be sized as an [[Infiltration:_Sizing_and_modeling|infiltration trench]].  
If additional storage volume is desired beneath an underdrain pipe, this may be sized as an [[Infiltration:_Sizing_and_modeling|infiltration trench]].  
==Construction==
==Construction==
{{:Bioretention: Construction}}
{{:Bioretention: Construction}}
Line 49: Line 48:
<h3>In Ontario</h3>
<h3>In Ontario</h3>
<strong>City of Mississauga</strong><br>
<strong>City of Mississauga</strong><br>
The City of Mississauga has a stormwater management credit program which includes RWH as one of their recommended site strategies[https://www.mississauga.ca/portal/services/credit-program].  
The City of Mississauga has a stormwater management credit program which includes RWH as one of their recommended site strategies [https://www.mississauga.ca/portal/services/credit-program].  
<br>
<br>
<h3>LEED BD + C v. 4</h3>
<h3>LEED BD + C v. 4</h3>

Navigation menu