Bioretention: Performances

From LID SWM Planning and Design Guide
Revision as of 16:02, 30 January 2023 by DanielFilippi (talk | contribs)
Jump to navigation Jump to search
Bioretnetion TP.jpg

Phosphorus Reduction[edit]

The performance results for Bioretention practices, located within TRCA's watershed originate from three primary sites:

  • Kortright Centre
  • Earth Rangers
  • Seneca College
  • Central Parkway (Mississauga)
  • Wychwood Subdivision (Brampton)
  • IMAX Corporation, head office

The mean performance value recorded at the outlet for Bioretention practices' ability to remove Total Phosphorus (TP) was calculated based on 355 separate recordings between 2005-2007, 2011-2019 and 2021 amongst the six sites previously mentioned.

TSS Reduction[edit]

Bioretnetion TSS.jpg

The performance results for Bioretention practices, located within TRCA's watershed originate from three primary sites:

  • Kortright Centre
  • Earth Rangers
  • Seneca College
  • Central Parkway (Mississauga)
  • Wychwood Subdivision (Brampton)
  • IMAX Corporation, head office

The mean performance value recorded at the outlet for Bioretention practices' ability to remove Total Phosphorus (TP) was calculated based on 301 separate recordings between 2005-2007, 2011-2019 and 2021 amongst the sixsites previously mentioned.