Changes

Jump to navigation Jump to search
no edit summary
Line 155: Line 155:
<br>
<br>
*Step 13: Calculate practice drainage time, t<sub>p</sub> (h), which is the time required to fully drain d<sub>i</sub> or d<sub>i</sub>' assuming one dimensional drainage from the storage reservoir bottom:
*Step 13: Calculate practice drainage time, t<sub>p</sub> (h), which is the time required to fully drain d<sub>i</sub> or d<sub>i</sub>' assuming one dimensional drainage from the storage reservoir bottom:


==Calculate peak flow rates==  
==Calculate peak flow rates==  

Navigation menu