  • curprev 15:28, 22 September 2022SamanthaPelayo talk contribs 903 bytes +6
  • curprev 16:15, 21 July 2022SamanthaPelayo talk contribs 897 bytes +897 Created page with "Riprap serves as a protective layer to: prevent sediment entering the underlying layers and clogging the LID facility, dissipate stormwater energy, and stabilize the terrain and slope. '''Construction Steps:''' #Backfill the material from the outside of the LID facility to avoid compaction. #Ensure the material is being placed to the elevation and thickness to the design requirements. '''Key Inspection Points:''' *Arrival of material to the site: material meets specif..."