Line 1: |
Line 1: |
| {{TOClimit|2}} | | {{TOClimit|2}} |
| Infiltration of stormwater into underlying native subgrade soils is one mechanism to achieving MECP [[runoff volume control targets]]. In many areas of Ontario, where municipal supplies of potable water are drawn from aquifers, it's also an important mechanism for groundwater recharge. | | Infiltration of stormwater into underlying native subgrade soils is one mechanism to achieving MECP [[runoff volume control targets]]. In many areas of Ontario, where municipal and private drinking water supplies are drawn from aquifers, it's also an important mechanism for groundwater recharge. |
| {{textbox|Drainage via infiltration be achieved through a number of LID BMP types: | | {{textbox|Drainage via infiltration be achieved through a number of LID BMP types: |
| *[[Infiltration chambers]] (underground) | | *[[Infiltration chambers]] (underground) |
Line 7: |
Line 7: |
| *[[Bioretention]] (surface, full- or partial-infiltration design variations) | | *[[Bioretention]] (surface, full- or partial-infiltration design variations) |
| *[[Bioswales]] (surface, full- or partial-infiltration design variations) | | *[[Bioswales]] (surface, full- or partial-infiltration design variations) |
| *[[Enhanced swales]] (surface, full- or partial-infiltration design variations)
| |
| *[[Permeable pavements| Permeable pavements]] (surface, full- or partial-infiltration design variations) | | *[[Permeable pavements| Permeable pavements]] (surface, full- or partial-infiltration design variations) |
| *[[Stormwater Tree Trenches]] (surface) | | *[[Stormwater Tree Trenches|Stormwater tree trenches]] (surface) |
| | *[[Enhanced swales]] featuring check dams (surface) |
| *[[Dry ponds]] or infiltration basins (surface) | | *[[Dry ponds]] or infiltration basins (surface) |
| }} | | }} |
Line 26: |
Line 26: |
| #where prohibitions and/or restrictions exist per approved Drinking Water Source Protection Plans (e.g. should not be used to treat pavement runoff within 2 year time of travel wellhead protection areas; see MOECC guidance). | | #where prohibitions and/or restrictions exist per approved Drinking Water Source Protection Plans (e.g. should not be used to treat pavement runoff within 2 year time of travel wellhead protection areas; see MOECC guidance). |
| <br> | | <br> |
| See [[Site considerations]] for further guidance on potential site constraints and LID practice design considerations. | | See [[Site considerations]] for further guidance on potential site constraints and LID facility type selection and design considerations. |
|
| |
|
| ===Designing within constraints=== | | ===Designing with constraints=== |
| {{textbox|Infiltration can still be optimized over 'tight' soils with infiltration rates ≤ 15 mm/hr: | | {{textbox|Infiltration facilities can be effective on low permeability soils with infiltration rates ≤ 15 mm/hr: |
| *See [[Underdrains| underdrains]] for [[Bioretention| bioretention]] and [[Trees| tree pits, trenches and soil cells]], and | | *See [[Underdrains| underdrains]] and |
| *Results from STEP studies of infiltration practices on [[low permeability soils]] | | *Results from STEP studies of infiltration facilities located on [[low permeability soils]] in Ontario. |
| Infiltration facilities should be designed with modifications where: | | Infiltration facilities should be designed with modifications where: |
| #the underlying bedrock is within 1 m below the bottom of the proposed BMP, or | | #the underlying bedrock is within 1 m below the bottom of the proposed BMP, or |