Changes

Jump to navigation Jump to search
Line 28: Line 28:
See [[Site considerations]] for further guidance on potential site constraints and LID facility type selection and design considerations.  
See [[Site considerations]] for further guidance on potential site constraints and LID facility type selection and design considerations.  


===Designing within constraints===
===Designing with constraints===
{{textbox|Infiltration facilities can be effective on low permeability soils with infiltration rates ≤ 15 mm/hr:
{{textbox|Infiltration facilities can be effective on low permeability soils with infiltration rates ≤ 15 mm/hr:
*See [[Underdrains| underdrains]] and  
*See [[Underdrains| underdrains]] and  

Navigation menu