Changes

Jump to navigation Jump to search
Line 43: Line 43:
==Construction Costs==
==Construction Costs==


[[File:ConstructionTable InfilTrench Full Infil.PNG|thumb|left|615px|'''Construction Costs Per Unit Drainage Area (CAD$/m<sup>2</sup>) - Full Infiltration Design, 25 mm Treatment''']]
[[File:ConstructionTable InfilChamb Full Infil.PNG|thumb|left|610px|'''Construction Costs Per Unit Drainage Area (CAD$/m<sup>2</sup>) - Full Infiltration Design, 25 mm Treatment''']]


[[File:ConstructionTable InfilTrench Partial Infil.PNG|thumb|center|615px|'''Construction Costs Per Unit Drainage Area (CAD$/m<sup>2</sup>) - Partial Infiltration Design, 25 mm Retention''']]
[[File:ConstructionTable InfilChamb Partial Infil.PNG|thumb|center|615px|'''Construction Costs Per Unit Drainage Area (CAD$/m<sup>2</sup>) - Partial Infiltration Design, 25 mm Retention''']]




Line 52: Line 52:

Above you can find a cost breakdown of a 1000m<sup>2</sup> in two different configurations:<br>
Above you can find a cost breakdown of a 1000m<sup>2</sup> in two different configurations:<br>
#[[Infiltration trenches|Infiltration Trench: Full Infiltration]]  
#[[Infiltration chambers|Infiltration Chamber: Full Infiltration]]  
#[[Infiltration trenches|Infiltration Trench: Partial Infiltration]]
#[[Infiltration chambers|Infiltration Chamber: Partial Infiltration]]


As can be seen, regardless of design configuration, Material & Installation expenses represent the largest portion of total construction costs (75 to 76%).
As can be seen, regardless of design configuration, Material & Installation expenses represent the largest portion of total construction costs (75%).


==Life Cycle Costs==
==Life Cycle Costs==

Navigation menu