Inspection and Maintenance: Vegetated Filter Strips

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
Inspection & Maintenance Guidance of Vegetated filter strips, which are a vegetated stormwater best management practice that are gently sloping, densely vegetated areas that treat runoff as sheet flow from adjacent impervious areas. Similarly, soil amendment areas are any landscaped area where the topsoil has been amended to enhance its water holding capacity (TRCA, 2013[1])

Overview[edit]

Vegetated filter strips (a.k.a. buffer strips and grassed filter strips) are gently sloping, densely vegetated areas that treat runoff as sheet flow from adjacent impervious areas. They slow runoff velocity and filter out suspended sediment and associated pollutants, and provide some infiltration into underlying soils. Originally used as an agricultural treatment practice, filter strips have evolved into an urban SWM practice. Vegetation may be comprised of a variety of trees, shrubs and native plants to add aesthetic value as well as water quality benefits. With proper design and maintenance, filter strips can provide relatively high pollutant removal benefits. Maintaining sheet flow into the filter strip through the use of a level spreading device (e.g., pea gravel diaphragm) is essential. Using vegetated filter strips as pretreatment practices to other best management practices is highly recommended. They also provide a convenient area for snow storage and treatment, and are particularly valuable due to their capacity for snowmelt infiltration.

Properly functioning vegetated filter strips and soil amendment areas reduce the quantity of pollutants and runoff being discharged to municipal storm sewers and receiving waters (i.e., rivers, lakes and wetlands). In addition to their SWM benefits, they provide aesthetic value as attractive landscaped features.

Trash, debris and sediment builds up at these locations and can prevent water from flowing into or out of the practice.

Associated Practices[edit]

  • Grass Swales: A parabolic or trapezoidal-sized bottom, swale that contains grassed sloping sides and a filter media bottom to both convey overland flow and provide water treatment, and are often subject to more frequent maintenance. They generally contain an outlet structure at the lowest point for water to be sent to another LID BMP or the storm system; sometimes referred to as a roadside ditch. Does not contain check dams.
  • Swales: Swales are linear landscape features consisting of a drainage channel with gently sloping sides. Underground they may be filled with engineered soil and/or contain a water storage layer of coarse gravel material. Two variations on a basic swale are recommended as low impact development strategies, although using a combination of both designs may increase the benefit.
  • Bioswales are sometimes referred to as 'dry swales', 'vegetated swales', or 'water quality swales'. This type of BMP is form of bioretention with a long, linear shape (surface area typically >2:1 length:width) and a slope which conveys water and generally contains various water tolerant vegetation.

Inspection and Testing Framework[edit]

Example of a properly constructed Vegetated Filter Strip, which includes proper vegetation condition, composition coverage that are important visual indicators that will have to be maintained and checked regularly by trained staff. Source: (GVRD, 2005).[2].
Visual Indicators Framework - Vegetated Filter Strips

Component

Indicators

Construction Inspection

Assumption Inspection

Routine Operation Inspection

Verification Inspection
Contributing Drainage Area
CDA condition x x x x
Inlet
Inlet/Flow Spreader Structural Integrity x x x
Inlet/Flow Spreader Structural Integrity x x x x
Perimeter
BMP dimensions x x x
Filter Bed
Standing water x x x
Trash x x
Filter bed surface sinking x x x
Planting Area
Vegetation cover x x x x
Vegetation condition x x
Vegetation composition x x x


The image above shows a manual soil corer, a split soil core sampler kit which preserves the soil sample for further testing (i.e., bulk density) and acrylic core sample tubes. All examples of tools to be use for soil characterization testing. Source: (TRCA, 2016).[3].
Testing Indicators Framework - Bioretention/Swales

Component

Indicators

Construction Inspection

Assumption Inspection

Routine Operation Inspection

Verification Inspection
Testing Indicators
Soil characterization testing x x (x)
Surface infiltration rate testing x (x)
Note: (x) denotes indicators to be used for Performance Verification inspections only (i.e., not for Maintenance Verification inspections)

Construction Inspection Tasks[edit]

Example of a properly designed and implemented vegetated grass swale in a parking lot. It's important to check on the BMP after large storm events (>15 mm) to determine it's still in good condition and functioning as designed.

Construction inspections take place during several points in the construction sequence, specific to the type of LID BMP, but at a minimum should be done weekly and include the following:

  1. During site preparation, prior to BMP excavation and grading to ensure the CDA is stabilized or that adequate ESCs or flow diversion devices are in place and confirm that construction materials meet design specifications
  2. At completion of grading, prior to planting to ensure slopes and elevations are acceptable
  3. Prior to hand-off points in the construction sequence when the contractor responsible for the work changes (i.e., hand-offs between the storm sewer servicing, paving, building and landscaping contractors
  4. After every large storm event (e.g., 15 mm rainfall depth or greater) to ensure Erosion Sediment Controls (ESCs) and pretreatment or flow diversion devices are functioning and adequately maintained. View the table below, which describes critical points during the construction sequence when inspections should be performed prior to proceeding further. You can also download and print the table here
Vegetated Filter Strips

Construction Sequence Step & Timing

Inspection Item

Observations*
Site Preparation - after site clearing and grading, prior to BMP grading Natural heritage system and tree protection areas remain fenced off
ESCs protecting BMP layout area are installed properly
CDA is stabilized or runoff is diverted around BMP layout area
BMP layout area has been cleared and is staked/delineated
Benchmark elevation(s) are established nearby
Construction materials have been confirmed to meet design specifications
BMP Grading - prior to landscaping Excavation location, footprint, depth and slopes are acceptable
Excavated soil is stockpiled outside the CDA
Landscaping – after final grading, prior to planting Topsoil depth, degree of compaction and surface elevations at inlets and outlets are acceptable
Area is free of ruts, local depressions
Planting material meets approved planting plan specifications (plant types and quantities)
Note: for Observation Column: S = Satisfactory; U = Unsatisfactory; NA = Not Applicable*
  1. TRCA. 2013. Fact Sheet - LID Manual Master Reference List: Vegetated Filter Strips. https://sustainabletechnologies.ca/app/uploads/2013/01/Vegetated-Filter-Strips.pdf
  2. Greater Vancouver regional District (GVRD). 2005. Stormwater Source Control Design Guidelines 2005. Lanarc Consultants Ltd., Kerr Wood Leidal Associates Ltd. and Goya Ngan. April 2005. https://www.waterbucket.ca/rm/sites/wbcrm/documents/media/65.pdf
  3. STEP. 2016. Low Impact Development Stormwater Management Practice Inspection and Maintenance Guide. https://sustainabletechnologies.ca/app/uploads/2016/08/LID-IM-Guide-2016-1.pdf