All public logs

Jump to navigation Jump to search

Combined display of all available logs of LID SWM Planning and Design Guide. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).

Logs
  • 16:12, 21 July 2022 SamanthaPelayo talk contribs created page Construction: soil media and amendment (Created page with "Bioretention can be constructed over any soil type, but hydrologic soil group A and B are best for achieving water balance objectives. Facilities designed to infiltrate water should be located on portions of the site with the highest infiltration rates. STEP has detailed construction guidance on soil amendments available on its https://sustainabletechnologies.ca/home/urban-runoff-green-infrastructure/healthy-soils/construction-specifications-for-implementing-compost-am...")