All public logs
Jump to navigation
Jump to search
Combined display of all available logs of LID SWM Planning and Design Guide. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
(newest | oldest) View (newer 20 | older 20) (20 | 50 | 100 | 250 | 500)- 15:37, 13 September 2022 Kyle menken talk contribs created page File:Construction duties flowchart.png
- 15:37, 13 September 2022 Kyle menken talk contribs uploaded File:Construction duties flowchart.png
- 15:28, 13 September 2022 Kyle menken talk contribs created page File:Construction page lead photo.JPG
- 15:28, 13 September 2022 Kyle menken talk contribs uploaded File:Construction page lead photo.JPG
- 15:40, 10 August 2022 Kyle menken talk contribs created page File:Planting CVC Janet I McDougald.JPG
- 15:40, 10 August 2022 Kyle menken talk contribs uploaded File:Planting CVC Janet I McDougald.JPG
- 15:31, 10 August 2022 Kyle menken talk contribs created page File:Excavation belfountain swale.JPG
- 15:31, 10 August 2022 Kyle menken talk contribs uploaded File:Excavation belfountain swale.JPG
- 12:54, 8 August 2022 Kyle menken talk contribs created page File:Trimble unit.JPG
- 12:54, 8 August 2022 Kyle menken talk contribs uploaded File:Trimble unit.JPG
- 17:51, 4 August 2022 Kyle menken talk contribs created page File:Construction process.jpg
- 17:51, 4 August 2022 Kyle menken talk contribs uploaded File:Construction process.jpg
- 14:11, 4 August 2022 Kyle menken talk contribs created page Finishing grades and surface layer installation: vegetated LIDs (Created page with "==Overview== ''insert blurb here'' ==Soil media and amendments== {{:Construction: soil media and amendment}} ==Finish grading== {{:Construction: finish grading}} ==Large stone and riprap== {{:Construction: large stone and riprap}} ==Plant material verification and installation== {{:Construction: plant material verification and installation}} ==Mulch placement== {{:Construction: mulch placement}}...")
- 18:48, 3 August 2022 Kyle menken talk contribs created page Sub-grade (Created page with "The term “sub-grade” refers to the excavated bottom of native soils that forms the bottom of a ground-level LID practice. Excavation to the subgrade will differ depending on whether the design is for an infiltrating or a non-infiltrating LID system. If it’s an infiltrating practice, the sub-grade should be as level as possible to promote even infiltration across the facility’s footprint. For non-infiltrating practices, excavate sub-grade slopes to the design gra...")
- 18:44, 3 August 2022 Kyle menken talk contribs created page Post-construction (Created page with "==Overview== ''insert blurb here'' ==Addressing deficiencies== {{:Addressing deficiencies}} ==Final certification== {{:Final Certification}}")
- 18:33, 3 August 2022 Kyle menken talk contribs created page Finishing grades: inlet, outlet, and surface layer (Created page with "==Soil media and amendments== {{:Construction: soil media and amendment}} ==Finish grading== {{:Construction: finish grading}} ==Large stone and riprap== {{:Construction: large stone and riprap}} ==Plant material verification and installation== {{:Construction: plant material verification and installation}} ==Mulch placement== {{:Construction: mulch placement}} ==Stabilizing contributing drainage area== {{:Construction: stabilizing contributing drainage area}}...")
- 16:37, 3 August 2022 Kyle menken talk contribs created page Sub-surface components (Created page with "{{:Geotextiles: Installation}} {{:Underdrains: Installation}} {{:Impermeable liners: Installation}} {{:Overflow: Installation}} {{:Monitoring wells: Installation}} {{:Construction: storage reservoir}} ===Permeable pavement guidance=== Because permeable pavements may be required to support heavy loads (driveways, laneways, etc.), the sub-base and base course may require compaction to prevent heaving and shifting. {{:Sub-base reservoir}} {{:Base course}} {{:Const...")
- 16:28, 3 August 2022 Kyle menken talk contribs created page Base course (Created page with "===Base course=== In permeable pavement systems, the base course lies on top of the sub-base reservoir. See the Permeable pavements: Specifications page for base material specifications. The construction steps, key inspection points, and mistakes to avoid for the base course are the same as the guidance given in the storage reservoir section. However, depending on the municipality and the design, compaction of the base course may be required. For example, the City of...")
- 16:23, 3 August 2022 Kyle menken talk contribs created page Sub-base reservoir (Created page with "In permeable pavement systems, the sub-base is the layer of granular material that is laid on the sub-grade. The granular sub-base should be clear, crushed 50 mm stone. See the Permeable pavements: Specifications page for detailed sub-base material specifications. The construction steps, key inspection points, and mistakes to avoid for sub-base reservoir are the same as / similar to the guidance given in the storage reservoir section. However, depending on the municipal...")
- 19:11, 2 August 2022 Kyle menken talk contribs created page Excavation and grading (Created page with "==Excavation and grading== {{:Construction: clearing and grubbing}} {{:Construction: excavation and rough grade}} {{:Construction: final excavated grade and verification}}")