A graph showing increasing average levels of chloride found in Atherley Narrows, (a rural sampling location, between Lake Couchiching and Lake Simcoe), over the past few decades, due in part to increased use of rock salt in parking lots, roadways and commercial and residential properties. From 2005 - 2020 the amount of chloride increase per year has doubled when compared to 1971 - 1986 (1.26 mg/L per yr. vs. 0.63 mg/L per yr.) (LSRCA, 2021). It is estimated that by 2120 the average level of chloride within the the Lake Simcoe watershed will exceed the 120mg/L guideline set by CWQG. (LSRCA, 2018)[1]

Overview[edit]

A treatment train uses a combination of source (LID), conveyance and/or end-of-pipe practices to meet water quality, water quantity, water balance, and erosion design criteria for the site. These may be implemented to reduce the burden of facility maintenance, address a broader range of design criteria, increase overall treatment system performance, and/or control the rate of flow through downstream facilities.

Types of Treatment Train Designs[edit]

Examples of applications designed to address specific objectives include the following listed in the corresponding sections below:

1. Treatment trains designed to reduce maintenance burdens[edit]

These are the most common types of treatment trains. They typically involve installation of one or more pretreatment devices upstream or at the inlet of the primary stormwater treatment facility.

Example: Runoff into larger treatment practices such as bioretention or stormwater tree trenches may be pretreated by concrete sumps at curb cut inlets, forebays or catch basin inserts, which are designed to capture coarse sediment, debris and trash. Centralizing sediment and trash captured at the inlet or entrance to the facility reduces maintenance by preventing filter media clogging and limiting the area over which sediment and trash needs to be removed. In some cases, pre-treatment device clean-outs may be incorporated into existing municipal catch basin cleaning programs.

Performance calculation: If the downstream facility provides filtration, such as bioretention or stone filled trenches, the overall water quality performance of this facility would not increase with pretreatment because the coarse sediment and debris captured by the pretreatment device would be removed by the downstream facility even in the absence of pretreatment. The purpose of adding pre-treatment is to prevent clogging or filling and thereby reduce the cost and effort of long term maintenance and delay requirements for major facility rehabilitation or replacement.


2. Treatment trains designed to address one or more design criteria[edit]

These types of treatment trains combine practices that address different design criteria, in recognition that most individual stormwater facility types do not meet all design criteria as stand-alone facilities. For instance, stormwater wet ponds may provide water quality, erosion and flood control but not water balance control (i.e. runoff volume control). Bioretention provides good water quality and water balance control but are rarely designed for flood control.

Example: Proprietary filtration treatment device (providing water quality) draining to an underground infiltration trench or chamber system (providing water balance control). Overflows from the trench or chamber system could drain to a dry pond or other flood control facility to provide water quantity and erosion control). Another example may be to direct low flows from a stormwater management pond outlet to an infiltration practice.

Performance calculation: Treatment trains designed to address multiple design criteria may improve overall water quality performance by, for example, reducing water quality concentrations in the first facility and reducing water quality loads (through infiltration/evapotranspiration) in a second facility. Even if the effluent concentration from facility one and facility two are the same, the overall load reduction of the treatment train may be greater than provided by any one of the facilities alone.


3. Treatment trains designed to enhance overall treatment system performance[edit]

The design intent of these treatment trains is to enhance overall system performance. The previous category of treatment train may enhance performance, but the objective may not always be to address a broader range of stormwater criteria.

Example: A bioretention and infiltration chamber in series. Adding the second facility increases the overall area available for infiltration, which in turn reduces the overall load of pollutants to the receiver. This type of treatment may be advantageous where surface space is limited, but water balance requirements can not be met with available space allocated to the surface bioretention cell alone.

Performance calculation: In the example above, the bioretention facility would provide water quality load reductions through filtration (water quality concentration reductions) and infiltration (volume reductions). Since the second facility would receive effluent from the underdrain of the bioretention, no further reduction in TSS concentrations would be expected (ie. the TSS concentration would already be at the ‘irreducible’ level). The TSS water quality load would be reduced in the second facility only by further reductions in volumes through infiltration. If the parameter of interest was total phosphorus (TP) rather than TSS, there is the potential that the second facility may further reduce TP through filtration/adsorption, especially if the second facility contained reactive media designed to remove phosphorus.


4. Treatment trains designed to optimize treatment facility sizing through flow control[edit]

Upstream controls in this type of treatment train are intended to control flow rates to one or more downstream facilities rather than provide treatment. Controlling the rate of flow to the downstream facility allows it to either be sized for a lower treatment flow rate than would otherwise be the case (which reduces costs) or enhance the performance of the downstream facility by slowing the rate of inflows (treatment practices often perform better at lower inflow rates) and reducing the frequency of bypass flows.

Example: A filtration facility drained by a catchment with temporary upstream water storage through oversized storm sewer pipes, parking lot storage and/or orifice controlled roof drains. In the case of oversized storm sewers or parking lot storage, the pipe feeding the filtration facility would normally have an orifice to control flow rates draining into the facility.

Performance calculation: The capacity of this type of treatment train to improve performance depends on sizing of the downstream practice. If this practice (e.g. proprietary filtration MTD) is sized to the new controlled flow rate (and the design storm remains the same), then the performance of the facility may be the same or similar to what would have been achieved without upstream controls because there would be a similar number of overflows (i.e flows that bypass the treatment chamber). If the downstream practice is a settling device, such as an OGS, then the performance of the downsized facility may be slightly lower than without flow controls because performance of these devices are more sensitive than filters to the rate of flow through the treatment chamber (see performance curves and sizing tool for calculations below).

File:Cover OGS review sheet.PNG

Of course, the real world is not black and white, and it is possible to blend these categories to meet a variety of different site stormwater management objectives. The purpose of categorizing the treatment train types into design priorities is to highlight the need to consider different objectives, while recognizing that if the design priority of the treatment train is narrowly focused, objectives other than those targeted may not be met.

Calculating Water Quality Performance of Treatment Trains[edit]

The performance of a treatment train will vary based on the type of stormwater treatment practices implemented and their arrangement within the treatment train. Various changes occur as runoff moves through the treatment train. Key changes that need to be considered when calculating treatment train performance include:

1. Changes in the composition of runoff, especially the size distribution of sediment particles.[edit]

Stormwater facilities are often designated as providing enhanced (80% TSS removal) or basic treatment (50 to 60% TSS removal) based on their capacity to remove fine particles (MOE, 2003)[2]. These facilities change not only sediment loads of sediment but also the composition of sediment loads, which has important implications for calculating performance.