Changes

Jump to navigation Jump to search
no edit summary
Line 43: Line 43:
|''A<sub>i''||m<sup>2</sup>||Impermeable area within the catchment
|''A<sub>i''||m<sup>2</sup>||Impermeable area within the catchment
|-
|-
|''d''||m||Depth of the infiltration BMP, total of all components
|''d''||m||Depth of the practice, total of all components
|-
|-
|''A<sub>p''||m<sup>2</sup>||Permeable area (i.e. footprint area of the infiltration BMP)
|''A<sub>p''||m<sup>2</sup>||Permeable footprint area of the practice
|-
|-
|''x''||m||Perimeter of the infiltration BMP
|''x''||m||Perimeter of the practice
|-
|-
|''K''||mm/hr||Saturated hydraulic conductivity of the filter media or fill used in the infiltration BMP  
|''K''||mm/hr||Saturated hydraulic conductivity of the filter media or fill used in the practice  
|}
|}


This spreadsheet tool has been set up to perform all of the infiltration BMP sizing calculations shown below<br>
This spreadsheet tool has been set up to perform all of the infiltration practice sizing calculations shown below<br>
{{Clickable button|[[Media:Infiltration Sizing.xlsx|Download Infiltration Sizing.xlsx calculator tool]]}}
{{Clickable button|[[Media:Infiltration Sizing.xlsx|Download Infiltration Sizing.xlsx calculator tool]]}}


Navigation menu