Changes

Jump to navigation Jump to search
Line 4: Line 4:

==Procedure==
==Procedure==
# Collect [[soil]] samples for each defined soil layer below the bottom of the proposed infiltration facility. Layers must be evaluated to the following depths, depending upon facility type:
# Collect [[Soil| soil]] samples for each defined soil layer below the bottom of the proposed infiltration facility. Layers must be evaluated to the following depths, depending upon facility type:
#* For [[bioretention]] facilities, analyze each defined layer below the proposed facility bottom to a depth of at least 3 times the maximum ponding depth, but not less than 1 m.  
#* For [[bioretention]] facilities, analyze each defined layer below the proposed facility bottom to a depth of at least 3 times the maximum ponding depth, but not less than 1 m.  
#* For [[permeable paving]], analyze each defined layer below the proposed facility bottom to a depth of at least 3 times the maximum depth of water within the base course, but not less than 1 m.  
#* For [[permeable paving]], analyze each defined layer below the proposed facility bottom to a depth of at least 3 times the maximum depth of water within the base course, but not less than 1 m.  

Navigation menu