Changes

Jump to navigation Jump to search
9 bytes removed ,  4 years ago
no edit summary
Line 7: Line 7:
*Immediately upgrade of median breaks, crosswalks, and street intersections.   
*Immediately upgrade of median breaks, crosswalks, and street intersections.   


It is good practice to have several inlets sized to split higher flow between a number of smaller BMPs or along the length of a linear pratice ([[Overflow|Offline overflow]]).  
It is good practice to have several inlets sized to distribute inflow along the length of the practice or between multiple facilities ([[Overflow|Offline overflow]]).  


{| class="wikitable"
{| class="wikitable"

Navigation menu