Line 30: |
Line 30: |
| #Thoroughly saturate and allow to settle for at least one week. After this time, tamp manually to check settling is complete. Alternatively, installations made in the fall can be left to settle over the whole [[winter]] season at this point, | | #Thoroughly saturate and allow to settle for at least one week. After this time, tamp manually to check settling is complete. Alternatively, installations made in the fall can be left to settle over the whole [[winter]] season at this point, |
| #Install temporary erosion and sediment control practices, | | #Install temporary erosion and sediment control practices, |
| #:'''Conduct all other site construction activities (buildings/servicing etc.)''' | | #Conduct all other site construction activities (buildings/servicing etc.) |
| #Check condition of bioretention after settling period, remediate any deficiencies, | | #Check condition of bioretention after settling period, remediate any deficiencies, |
| #Install curbs and pavements and concrete [[pretreatment]] devices, | | #Install curbs and pavements and concrete [[pretreatment]] devices, |
Line 43: |
Line 43: |
| #Saturated system thoroughly to settle filer media particles around the roots of new plants, | | #Saturated system thoroughly to settle filer media particles around the roots of new plants, |
| #Irrigated the system as required to establish healthy vegetation cover, | | #Irrigated the system as required to establish healthy vegetation cover, |
| #Inspect and remediate deficiencies after any significant rainfall within the next 3 months or remainder of the first growing season. | | #Inspect and remediate deficiencies after any significant rainfall within the next 3 months or remainder of the first growing season. |
| | |
| | |
| | |
| | |
|
| |
|
| ==Facilities containing media== | | ==Facilities containing media== |