Changes

Jump to navigation Jump to search
no edit summary
Line 39: Line 39:

''Do the units check out for calculating the total depth of the stone reservoir? (i.e. should f' be in units of m/hr instead of m/day?)''
''Do the units check out for calculating the total depth of the stone reservoir? (i.e. should f' be in units of m/hr instead of m/day?)''
*The [[notation]] used in the equations on [[Permeable paving: Sizing]] is being brought into line with the other sections of the site. Units have also been checked and brought into line to millimeters and hours as used for the other BMPs.
*The [[notation]] used in the equations on [[Permeable pavements: Sizing]] is being brought into line with the other sections of the site. Units have also been checked and brought into line to millimeters and hours as used for the other BMPs.


'''16 July 2018'''
'''16 July 2018'''

Navigation menu