Line 30: Line 30:
===Designing within constraints===
===Designing within constraints===
{{textbox|Infiltration can still be optimized on low permeability soils with infiltration rates ≤ 15 mm/hr:
{{textbox|Infiltration can still be optimized on low permeability soils with infiltration rates ≤ 15 mm/hr:
*See [[Underdrains| underdrains]] for [[Bioretention| bioretention]] and [[Trees| tree pits, trenches and soil cells]], and  
*See [[Underdrains| underdrains]] for [[Bioretention| bioretention]] and [[Stormwater Tree Trences|stormwater tree trenches]], and  
*Results from STEP studies of infiltration practices on [[low permeability soils]]
*Results from STEP studies of infiltration practices on [[low permeability soils]]
Infiltration facilities should be designed with modifications where:  
Infiltration facilities should be designed with modifications where:  